top of page
Exam
unknown, Switzerland
Back in 2014, one of the exams consisted to give every students the same rules and restrictions to make Construction Documents for a residential building including plans, sections and details, within 15 days. The main given feature was the use of double reinforced cement walls with an isolation panel in between (sandwich wall) on the whole periphery.
The way this building was shown forced us to use isolation on top of the slab or above it, depending the situation. A flat roof following a sloped roof and the multiple balcony connected to the double reinforced cement wall were the main challenges, as well the windows situations because of the walls.
bottom of page